Theatre Projects Archives - 91Ƶ /tag/theatre-projects/ Design - Construction - Operations Thu, 02 Apr 2026 15:23:32 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 /wp-content/uploads/2026/01/cropped-SCN_favicon-32x32.png Theatre Projects Archives - 91Ƶ /tag/theatre-projects/ 32 32 Saban Center Tops Out in Tuscaloosa, Moving STEM-and-Arts Learning Campus Toward 2027 Opening /2026/04/02/saban-center-tops-out-in-tuscaloosa-moving-stem-and-arts-learning-campus-toward-2027-opening/ /2026/04/02/saban-center-tops-out-in-tuscaloosa-moving-stem-and-arts-learning-campus-toward-2027-opening/#respond Thu, 02 Apr 2026 15:23:32 +0000 /?p=54851 The Saban Center reached a key construction benchmark March 30 as crews and project partners celebrated the building’s topping out at the future STEM-and-artslearning campus in Tuscaloosa’s River District.

The post Saban Center Tops Out in Tuscaloosa, Moving STEM-and-Arts Learning Campus Toward 2027 Opening appeared first on 91Ƶ.

The post Saban Center Tops Out in Tuscaloosa, Moving STEM-and-Arts Learning Campus Toward 2027 Opening appeared first on 91Ƶ.

]]>
At the center of the complex, a 70-foot glass tower is expected to house an 18-foot illuminated globe described in project materials as a beacon for the evolving River District and a symbol of discovery and innovation. | Photo Credit: Saban Center

What You Need to Know

  • The project team marked a topping-out milestone for the Saban Center now rising in Tuscaloosa’s River District.
  • Plans call for a 118,000-square-foot complex on a 7.71-acre site along the Black Warrior River, with a 70-foot glass tower as a centerpiece.
  • Campus partners named include the State of Alabama STEM Hub, the Tuscaloosa Children’s Theatre and IGNITE (formerly the Children’s Hands-On Museum).
  • Design/delivery partners cited include Steinberg Hart (with Davis Architects), Stone Building Company,CambridgeSevenand Theatre Projects.

Learn More

TUSCALOOSA, Ala. — The Saban Center reached a key construction benchmark March 30 as crews and project partners celebrated the building’s topping out at the future STEM-and-artslearning campus in Tuscaloosa’s River District.

The facility, described as a first-of-its-kind campus combining science, technology, engineering and math with arts programming, is expected to open in 2027.

The marble-clad complex is being designed by Steinberg Hart in collaboration with Birmingham-based Davis Architects, with Stone Building Company serving as general contractor. Newly released renderings depict a series of curved pavilions connected to a transparent central tower.

“Saban Center is deeply personal to us—we’ve been involved every step of the way, working closely with the design team to shape a place where children of all ages can explore their curiosity and imagine what’s possible for their futures,” according to.

Renderings also show the building set into a natural slope on the 7.71-acre site, intended to reduce the perceived height at street level while creating a prominent landmark from the north. Project materials describe multiple outdoor approaches meant to position the campus as a public, inclusive destination for families and school groups.

The exterior facade is planned to use locally sourced recycled marble from the Alabama Marble Mineral & Mining Company. Inside, the design team selected regionally sourced woods and metals as part of a sustainability approach that emphasizes local sourcing, materialreuseand resilient construction.

At the center of the complex, a 70-foot glass tower is expected to house an 18-foot illuminated globe described in project materials as a beacon for the evolving River District and a symbol of discovery and innovation.

Led by Nick and Terry Saban and Nick’s Kids Foundation in partnership with the City of Tuscaloosa, the campus is being delivered through a public-private collaboration that also includes the State of Alabama, which plans toestablishthe State of Alabama STEM Hub on-site.

Project leaders framed the building design as integral to the learning mission. “The design of the Saban Center reflects a shared belief that architecture can actively support learning and discovery,” according to.

Tuscaloosa Mayor Walt Maddox also positioned the campus as a workforce-development asset, saying Saban Center “will be a catalyst for building Alabama’s future-ready workforce.”

This article is based on reporting originally published by Saban Center on March 30, 2026.

The post Saban Center Tops Out in Tuscaloosa, Moving STEM-and-Arts Learning Campus Toward 2027 Opening appeared first on 91Ƶ.

The post Saban Center Tops Out in Tuscaloosa, Moving STEM-and-Arts Learning Campus Toward 2027 Opening appeared first on 91Ƶ.

]]>
/2026/04/02/saban-center-tops-out-in-tuscaloosa-moving-stem-and-arts-learning-campus-toward-2027-opening/feed/ 0