NAC Architecture Archives - 91ĘÓƵ /tag/nac-architecture/ Design - Construction - Operations Wed, 15 May 2024 17:46:00 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 /wp-content/uploads/2026/01/cropped-SCN_favicon-32x32.png NAC Architecture Archives - 91ĘÓƵ /tag/nac-architecture/ 32 32 Malibu High School Tops Out Expansion Project /2024/05/21/malibu-high-school-tops-out-expansion-project/ Tue, 21 May 2024 11:44:00 +0000 /?p=52584 Personnel from general contracting firm C.W. Driver Companies recently attended a topping-out event held to celebrate the hoisting in place of a ceremonial beam at the new Malibu High School building.

The post Malibu High School Tops Out Expansion Project appeared first on 91ĘÓƵ.

The post Malibu High School Tops Out Expansion Project appeared first on 91ĘÓƵ.

]]>
By Eric Althoff

MALIBU, Calif.—Personnel from general contracting firm C.W. Driver Companies recently attended a topping-out event held to celebrate the hoisting in place of a ceremonial beam at the new Malibu High School building. Signed by school staff, students and local civic leaders, the steel beam-raising marks a major milepost in the $110 million construction project, which will add 70,000 square feet of educational space to the high school.

The new school building is being built atop the site of the former Juan Cabrillo Elementary School, located adjacent to Malibu High School. To make way for the new building, C.W. Driver and its partners had to demolish nine existing buildings encompassing nearly 40,000 square feet of space.

The new building will be the home of 70,000 square feet of space encompassing a library, STEM classrooms, performing arts and visual learning classrooms, cafeteria, and multipurpose spaces. For staff, the building will also house various administrative offices as well.

As designed by NAC Architecture, the two-story building will offer an open breezeway in between copper-clad and concrete walls. As part of NAC’s design, the outdoor common area will be at least partially shaded by a canopy overhead that will generate electricity for the school thanks to some photovoltaic panels installed therein. This will be in line with Malibu High School’s ethos of conservation and dedication to renewable energy.

NAC’s design for the school was recognized with an award from the California chapter of the American Institute of Architects this spring.

“This building will provide a quality educational environment,” said Superintendent Antonio Shelton at the ceremony. “This new school was made possible because of the support and dedication from the Malibu community.”

The topping out represents approximately the halfway point of the Phase 1 construction work.  The buildout commenced last November, and the building is expected to be open and ready for students come the fall of 2025. Phase 2 work will entail updating the middle school facilities, located on the same campus, and adding an Olympic-size swimming pool and other new facilities. That work is expected early in 2026.

Malibu High School is part of the Santa Monica-Malibu Unified School District. The construction work is being funded by money set aside by Measure M, which Malibu voters passed in 2018.

At the beam-signing and -hoisting ceremony, C.W. Driver Companies COO Brent Hughes praised his team’s work on the project thus far.

“Because of our extensive experience with over 150 K-12 projects for over 23 different school districts, we understand what it takes to safely construct educational facilities on time for our clients,” he said.  “We look forward to providing Santa Monica-Malibu USD with this space to invest in student success for many years to come.”

Other project partners working with C.W. Driver and NAC include Koning Eizenberg Architecture, Pfeiler & Associates Engineers, California Solar Integrators, Inc., AMPCO North Hunsaker and Associates.

The post Malibu High School Tops Out Expansion Project appeared first on 91ĘÓƵ.

The post Malibu High School Tops Out Expansion Project appeared first on 91ĘÓƵ.

]]>
Ground Breaks on Unique New High School in Malibu /2024/01/09/ground-breaks-on-unique-new-high-school-in-malibu/ Tue, 09 Jan 2024 11:43:19 +0000 /?p=52204 C.W. Driver Companies has commenced the first phase of its work on the $110 million construction project at Malibu High School, an educational institution that falls under the umbrella of the Santa Monica-Malibu Unified School District (SMMUSD).

The post Ground Breaks on Unique New High School in Malibu appeared first on 91ĘÓƵ.

The post Ground Breaks on Unique New High School in Malibu appeared first on 91ĘÓƵ.

]]>
By Eric Althoff

MALIBU, Calif.—C.W. Driver Companies has commenced the first phase of its work on the $110 million construction project at Malibu High School, an educational institution that falls under the umbrella of the Santa Monica-Malibu Unified School District (SMMUSD). The new school will be built upon the site of the former Juan Cabrillo Elementary School.

The first phase includes constructing a 70,000-square-foot building that will house a library, performing arts classrooms, multipurpose rooms, STEM classrooms, administrative offices and cafeteria. As designed by NAC Architecture, the two-story building will feature an open breezeway that is fashioned of copper-clad and concrete walls.

The exterior design calls for common areas for the high school’s students that will be shaded by an overhead canopy. Photovoltaic panels will help generate power from Southern California’s ample sunlight and aid in the project’s goals of energy conservation as well. C.W. Driver was able to source panels that would fit in with the roof steel trellis.

Prior to engaging in new buildout, C.W. Driver and its team also must demolish nine older buildings at the jobsite, totaling removal of 38,853 square feet of older construction. This preconstruction and demolition had to be executed while the plans for the new buildings were still being approved by the Division of the State Architect (DSA) so that the project timeline could be completed on time.

Subcontractors working with C.W. Driver and NAC Architecture include Koning Eizenberg Architecture, AMPCO North, California Solar Integrators, Inc., Hunsaker and Associates, and Pfeiler & Associates Engineers.

“C.W. Driver has the dedicated skill set and many years in school construction required for a project of this scope,” said Karl Kreutziger, President of C.W. Driver Companies. “Our extensive experience spans over 150 K-12 projects for more than 23 different school districts, totaling close to $2.2 billion worth of construction over the past 30 years. Having the opportunity to work on this project for SMMUSD is a perfect fit for us and our capabilities.”

In a subsequent statement to 91ĘÓƵ, C.W. Driver Project Executive David L. Amundson said that because the Pacific Coast Highway is the main point of entry for large trucks to access the smaller streets leading up to the job site, moving 19,000 cubic yards of materials up to the construction site through various neighborhoods on roads that branch off of PCH had to be handled delicately. Furthermore, ongoing supply chain issues have been a concern amid the aggressive construction schedule.

“The design includes building a new bus drop-off location around existing large, specimen trees that will require relocating the existing access road to the upper campus,” added Amundson. “The new access road goes around the perimeter of the new building and must be coordinated to take place so that there is no interrupted access to the upper campus from Morning View Drive.”

Measure M, passed by Malibu voters in 2018, is assisting with the funds for the project.

“We are excited to begin construction of the new Malibu High School,” said SMMUSD Superintendent Dr. Antonio Shelton. “This school will allow our students to have an educational experience that encourages exploration, project-based learning and the importance of collaboration.

“Our students will have classrooms that are safe, conducive to learning, and large enough to facilitate instructional practices that are cutting-edge.”

 

 

 

 

The post Ground Breaks on Unique New High School in Malibu appeared first on 91ĘÓƵ.

The post Ground Breaks on Unique New High School in Malibu appeared first on 91ĘÓƵ.

]]>
Facility of the Month: Hazel Wolf K-8 Embraces Nature /2017/08/18/facility-month-hazel-wolf-k-8-embraces-nature/ Fri, 18 Aug 2017 14:00:24 +0000 http://schoolconstructionnews.com/?p=43016 A curriculum that emphasizes environmental science set the tone for the design of the new Hazel Wolf K-8 school in Seattle.

The post Facility of the Month: Hazel Wolf K-8 Embraces Nature appeared first on 91ĘÓƵ.

The post Facility of the Month: Hazel Wolf K-8 Embraces Nature appeared first on 91ĘÓƵ.

]]>
By Jessie Fetterling

A curriculum that emphasizes environmental science set the tone for the design of the new Hazel Wolf K-8 school in Seattle. As an Environmental STEM (E-STEM) school, the urban facility needed a design that not only featured the typical flexible learning spaces seen in most of today’s 21st century schools, but also interior labs, green walls, outdoor learning spaces and gardens for students to get a well-rounded environmental education.

A key part of the school’s design is the outdoor courtyard space located on the roof of the building’s middle portion.

The 83,000-square-foot school was built on a 3.2-acre site in time for the 2016-17 school year. NAC Architecture served as the architect, while Lydig Construction served as the general contractor — both of which have local offices in the Seattle area.

“The main goal was to create a school that was custom made to suit [the district’s] E-STEM program and to do this in a creative way on a small piece of property, giving students good access to outdoors and their natural environment,” said Matt Rumbaugh, principal architect for NAC Architecture.

Embracing Nature

Research continues to show that nature and outdoor lessons enhance learning by triggering the curiosity of young learners. At Hazel Wolf, all subjects are taught through an environmental lens, starting at the kindergarten level. Early learners at the school partake in lessons that include a fallen leaf scavenger hunt, while third to fifth graders learn about the history of native cultures and earthquake analysis. Sixth through eighth graders are taught how to conduct soil filtration tests and practice creative writing while sitting in nature.

“The idea that environmental learning is something the school does on a day-to-day basis influenced the overall feel and layout of the building, and you really feel that when you go to the building,” Rumbaugh said.

The school’s specific lesson plans helped inspire the design for the facility itself, which can accommodate up to 680 students. The building was organized in three parts, with approximately one-third dedicated to outdoor spaces and the rest dedicated to indoor ones. The first part is a three-story academic building where a majority of the classrooms and science labs are located. The central portion includes the main office area, library and art room as well as an outdoor reading area off the library that connects to the central courtyard atop the building. The third section features a cafeteria commons, gymnasium, and music room and stage as well as a preschool space available for a licensed private provider.

A curriculum that emphasizes environmental science set the tone for the design of the new Hazel Wolf K-8 school in Seattle.
Photo Credit (All): Ben Benschneider

A key part of the design is the outdoor courtyard located on the roof of the building’s middle portion. This open-air space features several teaching areas focused on plantings and stormwater management, including a constructed rain garden for students to learn about the water cycle. Here, students can test water samples for pollutants.

“There is also an area in the courtyard where students can see where rainwater comes onto the site, how it’s dealt with, how it’s treated and how long it stays on site,” said Bill Dobyns, vice president of business development for Lydig Construction.

Other outdoor spaces include recreational fields, a butterfly garden and a botanical garden that serves as an outdoor laboratory.

Because the building is so focused on the outdoor environment, the design team addressed security in a couple of ways. First, the building itself wraps around the central courtyard to increase security, with doors and gates that allow the courtyard to be secured throughout the day. Additionally, the butterfly garden was located within the fenced area adjacent to the outdoor space, and students can only access the botanical garden with teacher supervision. Another way the school addresses security is through after-hour key-card access that limits and controls use of the building when classes are not in session.

Following a national trend in school security, the school also features a vestibule for visitors to enter through during school hours. The vestibule includes a camera and a buzzer/intercom system, so school administrators can see and communicate with everyone requesting access to the building before it is given, according to Dobyns.

The post Facility of the Month: Hazel Wolf K-8 Embraces Nature appeared first on 91ĘÓƵ.

The post Facility of the Month: Hazel Wolf K-8 Embraces Nature appeared first on 91ĘÓƵ.

]]>